| Information Technology Journal |
Minimizing maximum tardiness in single Computer Numerical Control machine scheduling with tool changes |
第一作者 |
2008/06 |
| Journal of applied sciences |
Two-machine flexible flow-shop scheduling with setup times |
第一作者 |
2008/06 |
| OR Spectrum |
Heuristic algorithms to solve the capacity allocation problem in photolithography area (CAPPA) |
第二作者 |
2008/06 |
| Academy of Taiwan Bussiness Management Review |
Comparing the Forecasting Performance by Using Power Transformation in VAR and Bayesian VAR Models |
第一作者 |
2008/04 |
| Mathematical Problems in Engineering |
Imperfect reworking process consideration in integrated inventory model under permissible delay in payments |
第一作者 |
2008/04 |
| Information Technology Journal |
Mathematical modeling of the IC final testing order selection problem |
第一作者 |
2008/04 |
| 清雲學報 |
台灣半導體產業股價走勢預測模型之研究 |
第一作者 |
2008/03 |
| 清雲學報 |
建構通路成員交易公平性之量表 |
第一作者 |
2008/03 |
| 清雲學報 |
應用模糊理論於調整生產率之整合存貨模式 |
第二作者 |
2008/03 |
| Journal of applied sciences |
Impact of Lead time and safety factor in mixed inventory models with backorder discounts |
第一作者 |
2008/02 |